7 flooring workers time 7.00 to 5.00 pm installing

       5 pcs mb-cd-kbo1
       8 pcs  mb-cd-kbo2
       2 pcs mb-bd-bco1
       2 pcs mb-cf-woc5
       8 pcs mb-bd-bbo8

2 electric worker  time 7.30 to 3.30 PM

GBR demo the front, find studs & mark the walls