7 flooring workers time 700 to 500  installing
      1pcs mb-cp-xco1
      2 pcs mb-bd-hco5
      2 pcs mb-gt-wdo1

2 labor workers time 700 to 330

Thin-Set Material used by marble:
            Beginning Balance:       76 bags
            Used:                                5 bags
            Ending Balance:            71 bags

Silver Sand Material used by marble:
            Beginning Balance:      41 bags
            Used:                                1 bag
            Ending Balance:           40 bags