7 flooring workers time 700 to 500 installing
      6 pcs no code
      sanded grout
      kimic on the floor

Thin-Set Material used by marble:
            Beginning Balance:       18 bags
            Used:                                5 bags
            Ending Balance:            13 bags

Silver Sand Material used by marble:
            Beginning Balance:       36  bags
            Used:                               1 bag
            Ending Balance:            35 bags

2 labor workers time 700 to 330

GBR:
Rigo
Jesse
Oscar
Fermin
Arturo
Roger