7 flooring workers time 700 to 500 installing
       1 pcs 1a
       1 pcs a2
       10 pcs ify1
       2 pcs mb-cp-gco1

1  labor workers

Thin-Set Material used by marble:
            Beginning Balance:       138 bags
            Used:                                 10 bags
            Ending Balance:            128 bags

Silver Sand Material used by marble:
            Beginning Balance:      47 bags
            Used:                                1 bag
            Ending Balance:           46 bags