ROGER REPORT:
---------------------------
2 flooring workers time 700 to 330 Installing
Sanded grout on the main stair
4 advanced workers time 8.25 to 4.45 installing
sand the floor on the kitchen 7
living room
horning the basement
GBR crew installing
putt drywall on bath 3
yellow tape & mug
put plywood on the stair
Rigo
Gino
Roger
Oscar
Jesse
Arturo
Eleana
-----------------------
GINO REPORT:
-----------------------
Bevelloni:
Removed drywall and paper in the living room for marble polishing.
Installed plywood at back stair case and basement stairs.
Finished doing demo at basement stairs for concrete cutting.
Installed drywall for bath 3 and master bedroom.
Cut stones per Sarwono to ship out today to Witono and Peter.
Marble honing at the kitchen and living room.
Installing GFRC's Juan will be finished today and will start fixing the left side of the house next week on Tuesday because Monday is a holiday and we can not work at Bevelloni. We will be in Palmdale installing the windows.
Cabinets: Are on hold until we hear from Tikno.
Boomlift: We have the lift until March 3 for the price of $1500