7 stone worker time 700 to 500 installing
       20 pcs 5g 
       1 pcs dr6 
       3 pcs dr5 
       sanded grout

Thin-Set used by Stone:
        Beginning Balance:        23 bags
        Used:                                 4 bags
        Ending Balance:             19 bags