6 flooring workers time 7.00 to 5.00 installing

       2 pcs mb-cd-wco4
       8 pcs mb-bd-eco1
       7 pcs mb-cd-fbo1

GBR installing

      Master bath 1.b five tall unit only
      bring down all door on the basement
      drywall the linen
      putt topping